Oil monitoring by industry

The equipment monitored and the risks the oil faces change from one industry to the next. The readings to watch are chosen accordingly.

Comparison by industry

Among large global companies, an hour of unplanned downtime was reported to cost an average of $2.3 million in automotive manufacturing and $187,500 in heavy industry1.

Monitored equipment, oil risks and monitoring benefits by industry
IndustryMonitored equipmentMain oil riskMonitoring goalBenefit
CementKiln motor, gearbox, compressorDust, high heat, contaminationContinuous monitoring of kiln-line oilLower risk of unplanned kiln stops.
Steel & metals1Rolling-mill hydraulics, gearbox, pumpHeat, water, particlesOil condition under heavy loadFewer costly downtime hours.
Automotive suppliers1Hydraulic press, compressor, line gearboxWater ingress, particles, viscosity driftOil tracking without stopping the lineLower risk of line stoppages.
Plastic injection, pressesHydraulic unit, pump, valveParticles, water, viscosity driftHydraulic oil cleanlinessHelps protect valve and pump life.
Construction & mobile equipmentHydraulic pump, valve, gearboxParticles, dust ingress, waterOil cleanliness in the fieldLower risk of dirty-oil breakdowns.
Paper & pulpHeavy gearbox, pump, centrifugeFibre, chemicals, moistureKeeping the line runningLower risk of unplanned line stops.
Power generationTurbine, generator, auxiliary pumpOxidation, moisture, contaminationContinuity of outputLower risk of unplanned outages.
Food & beverageCompressor, hydraulic system, gearboxOxidation, oil vapour, contaminationEarly sign of oil degradationFewer unplanned production stops.
MarineMain engine (diesel), turbo, generatorFuel dilution, water, wearOil condition at seaLower risk of stops at sea.
Mining1Hydraulic system, gearbox, compressorDust, water, particlesOil condition on siteFewer costly downtime hours.

The risk column lists the general oil risks in each industry. We do not measure all of them. What we measure and what we do not.
1 Source: Siemens, “The True Cost of an Hour's Downtime” (True Cost of Downtime 2024). Automotive manufacturing averaged $2.3 million per hour and heavy industry (such as steel and mining) $187,500. These are averages for large global companies. Figures for your plant and for automotive suppliers are different. We found no published figure for cement, power, food or marine. We give no figure in those rows.

The first step is a discussion of the important equipment in the plant.